SAP EAM Work Center Guide – Definition, Attributes, T-Codes, and IT Support Example


Explore a complete guide on SAP EAM Work Centers including definitions, key attributes, usage in maintenance orders, related transaction codes, and a real-world IT support center example for universities.

In SAP EAM (Enterprise Asset Management), a Work Center is a key master data object that represents a location where maintenance work is carried out. It can refer to a group of people (like technicians or electricians), a physical place (like a workshop), or a piece of equipment used to perform work.


Table of Contents

  1. Definition
  2. Key Attributes of a Work Center
  3. Usage in SAP EAM
  4. Transaction Codes Related to Work Centers
  5. Example: IT Support Center Maintenance Department in SAP EAM

1. 🛠️ Definition:

A Work Center in SAP EAM is an organizational unit that:

  • Performs maintenance tasks
  • Is assigned to maintenance orders and operations
  • Enables capacity planning and cost tracking

2. 🔑 Key Attributes of a Work Center:

Attribute Description
Work Center ID Unique identifier (e.g., ELEC_01, MECH_02)
Work Center Category Defines type (personnel, machine, production line, etc.)
Plant The plant where the work center is located
Cost Center For tracking labor or machine costs
Personnel Assignment Links to employees or user IDs
Available Capacity Defines working hours, shifts, holidays
Activity Types Used for internal cost allocation (e.g., Maintenance Labor, Inspection)
Scheduling Info Used in order scheduling for start and finish times

3. 🧾 Usage in SAP EAM:

🔹 In Maintenance Orders (IW31, IW32):

  • You assign a Work Center to each operation.
  • It determines who will do the work, where, and at what cost.

🔹 For Costing:

  • Costs (labor hours, machine time) are calculated based on the Work Center and Activity Type combination.

🔹 For Capacity Planning:

  • You can schedule work and avoid overloading technicians or machines.

📌 Example:

A university’s Electrical Maintenance Department has the following setup:

  • Work Center: ELEC_LAB
  • Plant: UNIV_CAMPUS
  • Cost Center: MAINT_ELECTRICAL
  • Activity Type: LABOR_ELEC
  • Personnel Assigned: 3 electricians
  • Used In: All orders related to lab electrical repairs

T-Code Description
CR01 Create Work Center
CR02 Change Work Center
CR03 Display Work Center

🖥️ Example: IT Support Center Maintenance Department in SAP EAM

🏢 Organization Context:

  • Company: ABC University
  • Department: IT Support Center
  • Responsibility: Manages maintenance of desktop PCs, laptops, printers, servers, and network hardware across campus.

🧰 1. Work Center (CR01)

Field Example Value
Work Center ID IT_SUPPORT_01
Description IT Support & Repair Unit
Plant UNIV_MAIN
Cost Center COST_IT_SUPPORT
Activity Type IT_REPAIR_HOUR
Category Personnel
Capacity 5 technicians, 8 hrs/day
Location Main IT Support Office, Admin Block

🏗️ 2. Functional Locations

Location ID Description
CAMPUS/IT/LAB1 Computer Lab 1
CAMPUS/IT/SERVER_ROOM Central Server Room
CAMPUS/ADMIN/HRPC HR Department Workstation

🧾 3. Maintenance Scenario

Scenario: Printer in HR department is not working.


🛠️ 4. Maintenance Process Flow

📍 Step 1: Create Maintenance Notification

  • T-Code: IW21
  • Notification Type: M1 (Corrective Maintenance)
  • Description: Printer in HR not printing
  • Functional Location: CAMPUS/ADMIN/HRPC
  • Equipment: HR_PRINTER_002
  • Reported by: HR Admin

🧾 Step 2: Create Maintenance Order

  • T-Code: IW31
  • Order Type: PM01 (Corrective)
  • Functional Location: CAMPUS/ADMIN/HRPC
  • Work Center: IT_SUPPORT_01
  • Operations: Diagnose > Repair > Test
  • Component: Printer Cartridge (Material Code: PRT_CART_B1)
  • Storage Location: IT_STORE

📦 Step 3: Reservation & Goods Issue

  • System creates material reservation
  • Storekeeper issues cartridge using MIGO with Movement Type 261

🔧 Step 4: Perform & Complete

  • Technician repairs printer
  • Technician enters actual time and marks task as complete
  • Order status set to TECO

📊 Step 5: Cost Tracking & Analysis

  • Labor and material cost posted to COST_IT_SUPPORT
  • Reports generated using IW39 or MCJC

✅ Benefits of SAP EAM for IT Maintenance:

  • Structured breakdown tracking for hardware
  • Real-time visibility of inventory and tasks
  • Accurate costing of internal IT support
  • Performance reports of IT assets and support staff